POWER GENERATION,PACKAGED RIGHT.
Alegacy engineers and builds complete genset packages — enclosure, cooling, gas train, and switchgear integration — for data center and industrial power customers. A ground-up division, built to be building by January 2027.
FROM ENGINE TO PACKAGE
Every unit follows the same build sequence — standardized so lead time comes down as design basis locks in.
ENGINE & GENERATOR
Gas genset matched to site voltage. Engine-agnostic by design.
ENCLOSURE & STRUCTURAL
Formed double-skin steel panels and a seal-welded containment curb, built on an automated punch-and-bend line.
VENTILATION & ACOUSTICS
CFD-verified airflow and engineered silencing sized around the fan wall as a duct silencer, not an afterthought.
GAS TRAIN & ELECTRICAL
Switchgear, controls, and gas train integration engineered to the customer’s site and interconnect requirements.
TEST & DEPLOY
Factory test pad run, then delivery and commissioning support in the field.
BUILT FOR GRID-CONNECTED POWER
Packages engineered around how the load actually grows — not a single fixed-size build.
GRID-SYNCHRONIZED PEAKING & RESILIENCE
Sized and staged around how the load grows — grid-synchronized peaking and resilience, or prime power where the site calls for it.
GAS RECIP POWER
Natural-gas genset packages for industrial sites and independent power producers running dispatchable load.
A PORTFOLIO RELATIONSHIP
Standard design basis across sites means repeatable delivery as a developer’s footprint expands.
BUILDING TOWARD JANUARY 2027.
Standard design basis, fabrication-ready drawings, and a dedicated team — Alegacy’s Power Generation Packaging division is being built now. Reach out to talk through your site.
Talk to Our Power Generation Team